
[email protected]
whatsapp:959440045
6.1
Inlet/outlet and bowl
6
Dismantling & Assembly
15. Lift out operating slide (25) using the special
tool: lifting bolts for operating slide.
G0070721
16. Lift out lower distributing ring (26).
G0070821
17. Lift out bowl body (27) using the special tool.
18. Ease the bowl body off with the central screw of
the tool. If necessary, knock on the handle.
19. Soak and clean all parts thoroughly in suitable
cleaning agent, see
.
20. Clean nozzles (28) in bowl body (27) using soft
iron wire of maximum 1,2 mm diameter, see
5.3.4 Discharge mechanism on page 42
.
NOTE
Dirt and lime deposits in the sludge discharge
mechanism can cause discharge malfunction or failing
discharge.
21. Remove O-rings and replace them with spares
from the intermediate service kit (IS).
G0070922
86
www.fdm.com.pe