
[email protected]
whatsapp:959440045
6
Dismantling & Assembly
6.3
Friction coupling
2.
Degrease and clean the contact surfaces of
frame and motor adapter. Lubricate the contact
surfaces with Molykote 1000 paste. Then fit the
electric motor with adapter and friction coupling
in position. Also lubricate the threads of the belt
tightener with Molykote 1000 paste or similar.
3.
Fit and tighten the flat belt, see
.
4.
Install the water tank and the cover.
NOTE
The belt must be re-tightened before starting the
separator, see next page.
G0077341
121
www.fdm.com.pe