
[email protected]
whatsapp:959440045
6
Dismantling & Assembly
6.2
Bowl spindle and frame
12. Pull off ball bearing (15) using a puller (B) and
thrust washer (A). Pull off bearing (13) using the
special mounting tool (C) and a hammer.
NOTE
Always discard a used bearing.
G0076351
13. Loosen the screws and lift off the frame
intermediate part (21).
14.
In case of 3-year-service
Discard the O-ring (22). This O-ring is not
included in any service kit, but must be ordered
separately.
G0093791
103
www.fdm.com.pe