7.13.8 Planning of installation
Space for separator
The separator shall be placed in such a way
that suitable space for maintenance and repair
is obtained.
The space required for one or more separators
can be calculated by consulting the drawings in
the chapters
Basic size drawing on page 136
,
Foundation drawing on page 146
and instructions
for ancillary equipment, electrical and electronic
equipment and cables.
G0020611
Check the drawings when planning the
installation
Specification
•
See chapter
Foundation drawing on page
146
for the service space required with the
separator installed. The spanner for the large
lock ring should have sufficient space to make
a complete turn without touching any of the
ancillary equipment surrounding the separator.
Recommendation
•
The spanner for the large lock ring should
have sufficient space to make a complete turn
without touching any of the ancillary equipment
surrounding the separator.
Important measurements
Important measurements are the minimum
lifting height for lifting tackle, shortest distance
between driving motor and wall, free passage
for dismantling and assembly, maintenance and
operation.
Plan your installation with sufficient room for
the controls and operation so that instruments
are easily visible. Valves and controls must
be within convenient reach. Pay attention to
space requirements for maintenance work, work
benches, dismantled machine parts or for a
service trolley.