
[email protected]
whatsapp:959440045
7.11
Performance data, in- and outlet device
150
7.12
Machine plates and safety labels
7.13
Storage an Installation
7.13.1
Introduction
7.13.2
Protection and storage of goods
7.13.3
Storage at out of operation
7.13.4
Before start-up
7.13.5
Connections to surrounding equipment
7.13.6
Reassembly and Start up
7.13.7
Storage and transport of goods
7.13.8
Planning of installation
7.13.9
Foundations
8
Operating
167
8.1
Operating routine
8.2
Clarifier Operation
168
8.2.1
Operating water interface
8.3
Purifier Operation
8.3.1
Operating water interface
8.3.2
Selection of gravity disc
8.3.3
Gravity disc nomogram
8.4
Before first Start
8.5
Start after a service
174
8.5.1
Before normal start
8.5.2
Starting and running-up procedure
8.5.3
Separation
8.5.4
Stopping procedure
8.5.5
Safety stop
8.6
After Safety Stop
6
www.fdm.com.pe