3.6 Lubrication and maintenance operations
3.6.22 Battery check
Perform battery check when the machine is parked on a flat and
solid surface with the engine and battery disconnecter off.
The machine is delivered from the manufacturer with a mainte-
nance-free battery.
If a maintenance-free battery is installed in the machine, it is not
necessary to check the electrolyte level and refill the electrolyte
for the entire service life of the battery.
Perform battery charging as needed according to instructions of
the battery manufacturer.
Note
A rest voltage on clamps is only checked on a maintenance-free
battery. The battery cannot be refilled. If the rest voltage is 12.6
V and more, the battery is fully charged. If the rest voltage is
below 12.4 V, the battery should be charged. After the battery is
charged, leave it to stand for 2 – 3 hours and then measure the
voltage again. It is recommended to mount the battery 24 hours
after charging.
The rest voltage is the voltage measured at the clamps of the
battery, which was at rest for at least 12 hours – it was not either
charged or discharged.
Battery check procedure:
• Open the left material hopper side cover (1).
• Clean the battery surface.
• Measure the rest voltage of the battery, and charge the bat-
tery if required.
• Check the condition of the (+) pole, (-) pole and clamps.
• Clean the + pole, the - pole and the clamps.
• Apply a thin layer of grease on the clamps.
• Close the left material hopper side cover (1).
Note
In case of a long-term shut-down of the machine or its stor-
age, dismount the battery and store it to be protected from
frost. Charge the battery before and during storing and before
mounting the battery on the machine.
Summary of Contents for Dynapac F80W
Page 1: ...OPERATING MANUAL Asphalt paver wheeled F80W Hatz 4812217930 ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 14: ...8 F80W ...
Page 15: ...9 F80W SPECIFICATION MANUAL 1 SPECIFICATION MANUAL F80W Hatz Tier 4 Final ...
Page 18: ...12 F80W W1 W2 W W3 W4 B L L1 H H1 D451170A A L2 1 2 Dimensional drawing of the machine ...
Page 32: ...26 F80W Notes ...
Page 33: ...27 F80W SPECIFICATION MANUAL Notes ...
Page 34: ...28 F80W ...
Page 35: ...29 F80W OPERATING MANUAL 2 OPERATING MANUAL F80W Hatz Tier 4 Final ...
Page 62: ...56 F80W ...
Page 79: ...73 F80W 451043 451044 D451042 OPERATING MANUAL Augers Screed Conveyor ...
Page 123: ...117 F80W OPERATING MANUAL Notes ...
Page 124: ...118 F80W ...
Page 125: ...119 F80W MAINTENANCE MANUAL 3 MAINTENANCE MANUAL F80W Hatz Tier 4 Final ...
Page 126: ...120 F80W ...
Page 191: ...185 F80W 451190 MAINTENANCE MANUAL ...
Page 193: ...187 F80W 451900 1 1 1 11 5 A 12 V 2 2 10 12 3 3 3 4 5 4 6 7 8 9 8 MAINTENANCE MANUAL ...
Page 196: ...190 F80W 3 8 Appendices Notes ...
Page 197: ......
Page 198: ...www dynapac com ...