95
F80W
D451088
2
3
19
15
8
451087A
P
0
R
F
8
10
D451686
48
OPERATING MANUAL
2.6.2 Screed lock
The screed is locked to prevent a spontaneous fall of the screed
due to possible leaks in the hydraulic system.
Lock the screed with the machine parked and started, the travel
controller (8) must be set in the neutral position (N).
If the screed of the machine is not in use, during movement or
transport of the machine on another vehicle, the screed tow
arms must always be locked using lock pins.
Procedure for locking the screed:
• Set the travel controller (8) to the neutral position (N).
• Check that both screed lock pins (2) are inserted.
• Set the engine speed adjusting controller (10) to the maxi-
mum speed.
• Switch over the transport/operating mode switch (15) to the
upper position.
• Press the foot switch (48).
• To lift the screed, switch over the switch lift/lower switch
(19) up, and after reaching the maximum screed position
release the switch.
• Release the foot switch (48).
• Extend both the screed lock pins (2).
• Press the foot switch (48).
• Lower the screed until the screed tow arms (3) lie on the lock
pins (2).
• After the contact of the screed tow arms (3) with the lock
pins (2), switch over the screed lift/lower switch (19) to the
central position.
Procedure for unlocking the screed:
• Set the travel controller (8) to the neutral position (N).
• Set the engine speed adjusting controller (10) to the maxi-
mum speed.
• Switch over the transport/operating mode switch (15) to the
upper position.
• Press the foot switch (48).
• To lift the screed, switch over the switch lift/lower switch
(19) up, and after reaching the maximum screed position
release the switch.
• Release the foot switch (48).
• Retract both the screed lock pins (2).
• Set the screed to the required position.
Due to leaks in the hydraulic system, the screed may
gradually lower if the screed tow arms are not locked.
In case of failure of the hydraulic system, the screed may
fall spontaneously if the screed tow arms are not locked.
In the event of failure of the hydraulic system, there is
a risk of injury from the falling screed.
If the screed of the machine is not in use, during move-
ment or transport of the machine on another vehicle, the
screed tow arms must always be locked using lock pins.
Summary of Contents for Dynapac F80W
Page 1: ...OPERATING MANUAL Asphalt paver wheeled F80W Hatz 4812217930 ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 14: ...8 F80W ...
Page 15: ...9 F80W SPECIFICATION MANUAL 1 SPECIFICATION MANUAL F80W Hatz Tier 4 Final ...
Page 18: ...12 F80W W1 W2 W W3 W4 B L L1 H H1 D451170A A L2 1 2 Dimensional drawing of the machine ...
Page 32: ...26 F80W Notes ...
Page 33: ...27 F80W SPECIFICATION MANUAL Notes ...
Page 34: ...28 F80W ...
Page 35: ...29 F80W OPERATING MANUAL 2 OPERATING MANUAL F80W Hatz Tier 4 Final ...
Page 62: ...56 F80W ...
Page 79: ...73 F80W 451043 451044 D451042 OPERATING MANUAL Augers Screed Conveyor ...
Page 123: ...117 F80W OPERATING MANUAL Notes ...
Page 124: ...118 F80W ...
Page 125: ...119 F80W MAINTENANCE MANUAL 3 MAINTENANCE MANUAL F80W Hatz Tier 4 Final ...
Page 126: ...120 F80W ...
Page 191: ...185 F80W 451190 MAINTENANCE MANUAL ...
Page 193: ...187 F80W 451900 1 1 1 11 5 A 12 V 2 2 10 12 3 3 3 4 5 4 6 7 8 9 8 MAINTENANCE MANUAL ...
Page 196: ...190 F80W 3 8 Appendices Notes ...
Page 197: ......
Page 198: ...www dynapac com ...