Creating and Starting a Test Case
70
IQS-8500 Series and IQS-8120NGE/8130NGE
Introducing the Test Setup
The test path is created through the configuration of each layer that must
be crossed by the signal under test. The test path can contain the following
steps depending on the test application type:
For IQS-8510B:
For IQS-8510G:
For IQS-8120NGE/IQS-8130NGE and IQS-8525/IQS-8535: