Removing the Top Cover
Figure 7-12:
A.
Top cover
B.
M5 x 12 mm button head socket screws (4)
C.
Chassis assembly
D.
M5 flat washers (4)
Procedure
1.
Set the
ON/OFF
switches on the front and back panel to OFF.
2.
Allow the analyzer to cool for at least two hours. Allow it to cool for twelve hours if
replacing the analysis cell.
3.
Disconnect all external cables.
Tag if necessary.
4.
Remove the analyzer from the rack and place on a flat, stable surface that can
accommodate the weight. This step requires two people to lift and transport the
analyzer.
Troubleshooting and diagnostics
Installation, Operations, and Maintenance Manual
71
Summary of Contents for Rosemount CT5400
Page 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Page 16: ......
Page 20: ...Contents iv Rosemount CT5400 ...
Page 32: ...Plan 12 Rosemount CT5400 ...
Page 40: ...Install 20 Rosemount CT5400 ...
Page 44: ...Startup procedure 24 Rosemount CT5400 ...
Page 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Page 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Page 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Page 166: ...Preventative maintenance 146 Rosemount CT5400 ...