To start up the analyzer, perform the following steps:
Procedure
1.
Visually inspect the exterior of the analyzer for signs of damage, corrosion, gas
leaks, or overheating. Report anything found to the maintenance organization.
2.
Make sure that the analyzer has been correctly installed (see
Chapter 2
).
3.
Make sure that the rack lid is fitted to the analyzer. If it is not, report it to the
maintenance organization and do not proceed further until the rack lid has been
fitted.
4.
Make sure that the
On/Off
switch at the rear of the analyzer is set to
I
(ON).
5.
On the front panel (
Figure 3-1
) of the analyzer, set the
On/Off
switch (B) to
I
(ON).
Check that the switch illuminates.
Front panel
Figure 3-1:
A. Display controller
B. Illuminated On/Off switch
The startup sequence commences automatically under software control.
Startup procedure
22
Rosemount CT5400
Summary of Contents for Rosemount CT5400
Page 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Page 16: ......
Page 20: ...Contents iv Rosemount CT5400 ...
Page 32: ...Plan 12 Rosemount CT5400 ...
Page 40: ...Install 20 Rosemount CT5400 ...
Page 44: ...Startup procedure 24 Rosemount CT5400 ...
Page 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Page 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Page 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Page 166: ...Preventative maintenance 146 Rosemount CT5400 ...