Replace an Ethernet switch
Figure 7-27:
A.
Ethernet connector (to analog input unit)
B.
Ethernet switch
C.
Ethernet connector (to Ethernet port)
D.
Ethernet connector (to Motherboard)
E.
Lever
F.
Wiring harness
Procedure
1.
Power down the analyzer by switching the
ON/OFF
switches on the front and rear
panel to the
OFF
position and allow the core to cool for twelve hours.
2.
Lock-out tag-out the power supply.
3.
Remove the analyzer from the rack using two people to lift the analyzer and place it
on a clean workbench.
4.
On the Ethernet switch (B), disconnect the Ethernet cable that links the Ethernet
switch to the analog input unit from Ethernet connector number 1 (A).
Troubleshooting and diagnostics
106
Rosemount CT5400
Summary of Contents for Rosemount CT5400
Page 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Page 16: ......
Page 20: ...Contents iv Rosemount CT5400 ...
Page 32: ...Plan 12 Rosemount CT5400 ...
Page 40: ...Install 20 Rosemount CT5400 ...
Page 44: ...Startup procedure 24 Rosemount CT5400 ...
Page 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Page 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Page 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Page 166: ...Preventative maintenance 146 Rosemount CT5400 ...