Removing the analysis cell
Figure 7-37:
A. Analysis cell (in insulation)
B. M6 spring washer
C. M6 flat washer
D. M6 x 20 mm socket head cap screw
11.
Inspect the replacement analysis cell for damage. If damaged, contact your local
Customer Care representative.
12.
Refer to
Figure 7-37
. Place the analysis cell (A) in position on the optical baseplate.
Dowels ensure that the location and alignment of the analysis cell is correct.
13.
Secure the analysis cell by fitting the four M6 x 20 mm socket head cap screws (D)
and associated M6 spring washers (B) and M6 flat washers (C) that were retained
during the removal procedure.
14.
Fit the thermal cut-out as described in
Section 7.20
, steps 13 through 15.
15.
Fit the gas temperature sensor as described in
Section 7.18
, steps 11 through 13.
16.
Refer to
Figure 7-36
. Use your fingers to push the insulation (B) until the port for the
pipe (C) is exposed.
17.
Fit the pipe to the port in the analysis cell and secure it with the tube fitting (A).
Apply a small quantity of Loctite 567 liquid PTFE compound to the threads of the
tube fitting before it is fitted. Secure the pipe by tightening the tube fitting
spanner
tight
.
18.
Fit the pressure sensor as described in
Section 7.19
, steps 11 through 16.
Troubleshooting and diagnostics
Installation, Operations, and Maintenance Manual
123
Summary of Contents for Rosemount CT5400
Page 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Page 16: ......
Page 20: ...Contents iv Rosemount CT5400 ...
Page 32: ...Plan 12 Rosemount CT5400 ...
Page 40: ...Install 20 Rosemount CT5400 ...
Page 44: ...Startup procedure 24 Rosemount CT5400 ...
Page 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Page 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Page 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Page 166: ...Preventative maintenance 146 Rosemount CT5400 ...