6.
Press the small lever (D) on the underside of the DC power supply (A) to release it
from the DIN rail. While continuing to press the lever, remove the DC power supply
from the DIN rail.
7.
Tag and disconnect all cables and connections as appropriate.
8.
Discard the unserviceable DC power supply.
9.
Inspect the replacement DC power supply for damage. If damaged, contact your
local Customer Care Representative.
10.
Place the replacement DC power supply (A) in its correct location on the DIN rail.
While pressing the small lever (D) on the underside of the DC power supply (A) to
the down position, push the DC power supply onto the DIN rail. Release the small
lever and check that the DC power supply is secure.
11.
Connect the wiring harness connector (B) to the top of the DC power supply (A).
12.
Refit the top cover as described in
Section 7.25
.
13.
Reinstall the analyzer in the rack. This step requires two people to properly lift and
transport it to the rack.
14.
Apply power to restart the analyzer.
7.17.3
Replacing the temperature controller
The two temperature controllers are identical; therefore, the replacement procedure for
only one is described. Each temperature controller plugs into a base unit that is mounted
on the DIN rail. The base unit has no active components and should not require
replacement.
DANGER!
ELECTRIC SHOCK
The analyzer operates using mains voltage that is dangerous to life. Make sure that the power
ON/OFF
switch at the rear of the panel is set to
OFF
and tagged off before removing the top
cover.
The analyzer must be earthed.
Death or personal injury may result if this is not observed.
WARNING!
HEAVY ITEM
Handle the analyzer with caution during unpacking, installing, maintaining, and transporting
to prevent crushing of hands, feet, or other body parts.
The analyzer weighs 31 kg (68 lb). Emerson
™
recommends that the analyzer is only moved and
lifted by a minimum of two people. Wear suitable protective gloves and protective footwear.
Failure to properly handle the analyzer may cause injury to personnel.
Troubleshooting and diagnostics
102
Rosemount CT5400
Summary of Contents for Rosemount CT5400
Page 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Page 16: ......
Page 20: ...Contents iv Rosemount CT5400 ...
Page 32: ...Plan 12 Rosemount CT5400 ...
Page 40: ...Install 20 Rosemount CT5400 ...
Page 44: ...Startup procedure 24 Rosemount CT5400 ...
Page 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Page 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Page 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Page 166: ...Preventative maintenance 146 Rosemount CT5400 ...