Power Socket Fuses
Figure 7-17:
A. Fuse holder
B. Fuse
C. Cover
4.
Pull out the fuse holder (A).
5.
Remove the fuse (B) from the holder (A) .
6.
Fit a new fuse (B), type: 240 V, 50 Hz, 500 mA, fast-acting, into the fuse holder (A).
7.
Fully push in the fuse holder (A).
8.
Close the fuse cover (C).
9.
Reconnect the external power supply to the power socket.
10.
Start up the analyzer by turning the
ON/OFF
switches to the
ON
position.
7.12
Replacing the internal fuses
The analyzer contains a number of internal fuses. The same procedure is used to replace all
of the internal fuses; therefore, the replacement of only one is described.
Troubleshooting and diagnostics
82
Rosemount CT5400
Summary of Contents for Rosemount CT5400
Page 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Page 16: ......
Page 20: ...Contents iv Rosemount CT5400 ...
Page 32: ...Plan 12 Rosemount CT5400 ...
Page 40: ...Install 20 Rosemount CT5400 ...
Page 44: ...Startup procedure 24 Rosemount CT5400 ...
Page 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Page 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Page 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Page 166: ...Preventative maintenance 146 Rosemount CT5400 ...