2.2
Rack mounting the analyzer
This procedure may require two people to safely move and rack mount the Rosemount
CT5400.
WARNING!
HEAVY ITEM
Handle the analyzer with caution during unpacking, installing, maintaining, and transporting
to prevent crushing of hands, feet, or other body parts.
The analyzer weighs 31 kg (68 lb). Emerson
™
recommends that the analyzer is only moved and
lifted by a minimum of two people. Wear suitable protective gloves and protective footwear.
Failure to properly handle the analyzer may cause injury to personnel.
Note
You must supply the rack.
Procedure
1.
One person aligns the analyzer's telescoping slide rails on the unit as the other
person carefully guides the analyzer into the rack using the front panel and rear
handles (see
Figure 2-1
).
Left Side View - Lifting Handles and Telescopic Slide Rails
Figure 2-1:
A. Rear panel handle
B. Telescopic slide for rack mount units
C. Front panel handles
2.
Make sure the chassis ventilation holes in the front, top, rear, and bottom are not
obstructed.
Install
14
Rosemount CT5400
Summary of Contents for Rosemount CT5400
Page 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Page 16: ......
Page 20: ...Contents iv Rosemount CT5400 ...
Page 32: ...Plan 12 Rosemount CT5400 ...
Page 40: ...Install 20 Rosemount CT5400 ...
Page 44: ...Startup procedure 24 Rosemount CT5400 ...
Page 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Page 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Page 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Page 166: ...Preventative maintenance 146 Rosemount CT5400 ...