D 102
D PL2
000.
G
B
10
2-
16
8 -
10.
0
1
Changeover for separate circuits of
rear strut towers
For some maintenance and repair work,
the rear strut towers will have to be indi-
vidually operated.
The joint hydraulic circuit will have to be
separated in such instances.
The changeover equipment can be
found on the underside of the machine,
between the two rear strut towers.
To separately operate the
strut towers:
- raise machine to the height required
and support.
- place appropriate lever or wrench on the square-head (1).
- remove retaining pin and grip.
- turn changeover valve anti-clockwise until the second detent bore (3) is under the
retaining pin.
- allow retaining pin to engage.
- the traction unit legs can now move separately using the traction unit buttons on the
rear side control panels.
Once maintenance and/or repair work is complete, turn the changeover valve back to
its original position so that the traction unit legs are moved together again.
Umschalt1.tif
1
2
Summary of Contents for PL2000S
Page 1: ...900 98 04 83 Cold planer PL2000S PL2100S Operating instructions Valid for 02 10 01...
Page 2: ......
Page 39: ...B 29 B PL2000 GB 29 34 10 01 39 48 20 50 9 34 43 44 45 46 41 42 35 35 36 49 40 47 38 37...
Page 40: ...B 30 B PL2000 GB 30 34 10 01 56 55 52 53 54 56 57 51...
Page 62: ...D 2 D PL2000 GB 2 168 10 01 2 Controls 2 3 PL2000new cdr 1...
Page 66: ...D 6 D PL2000 GB 6 168 10 01 3 8 9 2 1 4 5 10 11 12 Pult1neu Tif 7 5...
Page 82: ...D 22 D PL2000 GB 22 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 84: ...D 24 D PL2000 GB 24 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 86: ...D 26 D PL2000 GB 26 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 88: ...D 28 D PL2000 GB 28 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 90: ...D 30 D PL2000 GB 30 168 10 01 44 45 47 46 48 53 52 50 51 49 Pult2newa tif...
Page 92: ...D 32 D PL2000 GB 32 168 10 01 44 45 47 46 48 53 52 50 51 49 Pult2newa tif...
Page 119: ...D 59 D PL2000 GB 59 168 10 01 Engine fault codes...
Page 120: ...D 60 D PL2000 GB 60 168 10 01...
Page 121: ...D 61 D PL2000 GB 61 168 10 01...
Page 122: ...D 62 D PL2000 GB 62 168 10 01...
Page 123: ...D 63 D PL2000 GB 63 168 10 01...
Page 124: ...D 64 D PL2000 GB 64 168 10 01...
Page 125: ...D 65 D PL2000 GB 65 168 10 01...
Page 141: ...D 81 D PL2000 GB 81 168 10 01 2 3 1 9 5 7 6 4 13 12 10 11 14 15 8 Pult3new Tif...
Page 143: ...D 83 D PL2000 GB 83 168 10 01 2 3 1 9 5 7 6 4 13 12 10 11 14 15 8 Pult3new Tif...
Page 147: ...D 87 D PL2000 GB 87 168 10 01 2 5 1 7 4 6 3 12 11 8 10 13 14 9 Pult4new Tif...
Page 149: ...D 89 D PL2000 GB 89 168 10 01 2 5 1 7 4 6 3 12 11 8 10 13 14 9 Pult4new Tif...
Page 178: ...D 118 D PL2000 GB 118 168 10 01 Moba1can jpg 7 6 8 9 11 1 3 4 5 2 10...
Page 206: ...D 146 D PL2000 GB 146 168 10 01 6 8 MOBA Matic error messages...
Page 219: ...D 159 D PL2000 GB 159 168 10 01 Milling Pult2new_a tifPult3new tif 15 14 34 29 9 26 25 24...
Page 227: ...D 167 D PL2000 GB 167 168 10 01 Notlenkung2 jpg 9 10 11 3 1 2 4 7 8 5 6 12...