D 160
D PL2
000.
G
B
16
0-
16
8 -
10.
0
1
Once all the preparations for milling are complete, the machine is ready for milling,
the automatic levelling device is activated from the main control panel and the ma-
chine is lowered to the depth required while at a standstill.
- Release control lever (14) by pressing slide switch (15) and gently slide forwards
out of central point (within dead band range).
- At the same time, use the function key (9) of the rear side control unit control down
so that the machine dips into a horizontal position and in its final position is tilted
slightly more at the rear than at the front.
This milling position should be retained during the entire milling process, even if the
grading depth is changed via the digital controller.
- Set the milling speed required by pressing button (26) or (25).
The machine starts to move.
- Depending on the setting, the speed display (24) lights up.
The speed reached is shown on the display.
Other settings can also be made on the levelling equipment.
Milling operations using set-up button
If the machine is fitted with two operating panels and equipped for simultaneous op-
eration, the set-up button (39) then assigned the function task can be used to simply
lower the machine when stationary.
Milling drum, automatic levelling device and all other automatic functions needed for
milling operations must be activated in advance.
The simultaneous control lever need not be used to lower the machine in this function
so that the risk of forward motion can be ruled out.
Once the grading depth and position required has been reached in this way by acti-
vating the set-up button (LED active), release one of the two control levers and slide
forwards (LED of set-up button (39) is deactivated).
The machine begins to move forwards and all preset automatic functions are activat-
ed.
Summary of Contents for PL2000S
Page 1: ...900 98 04 83 Cold planer PL2000S PL2100S Operating instructions Valid for 02 10 01...
Page 2: ......
Page 39: ...B 29 B PL2000 GB 29 34 10 01 39 48 20 50 9 34 43 44 45 46 41 42 35 35 36 49 40 47 38 37...
Page 40: ...B 30 B PL2000 GB 30 34 10 01 56 55 52 53 54 56 57 51...
Page 62: ...D 2 D PL2000 GB 2 168 10 01 2 Controls 2 3 PL2000new cdr 1...
Page 66: ...D 6 D PL2000 GB 6 168 10 01 3 8 9 2 1 4 5 10 11 12 Pult1neu Tif 7 5...
Page 82: ...D 22 D PL2000 GB 22 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 84: ...D 24 D PL2000 GB 24 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 86: ...D 26 D PL2000 GB 26 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 88: ...D 28 D PL2000 GB 28 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 90: ...D 30 D PL2000 GB 30 168 10 01 44 45 47 46 48 53 52 50 51 49 Pult2newa tif...
Page 92: ...D 32 D PL2000 GB 32 168 10 01 44 45 47 46 48 53 52 50 51 49 Pult2newa tif...
Page 119: ...D 59 D PL2000 GB 59 168 10 01 Engine fault codes...
Page 120: ...D 60 D PL2000 GB 60 168 10 01...
Page 121: ...D 61 D PL2000 GB 61 168 10 01...
Page 122: ...D 62 D PL2000 GB 62 168 10 01...
Page 123: ...D 63 D PL2000 GB 63 168 10 01...
Page 124: ...D 64 D PL2000 GB 64 168 10 01...
Page 125: ...D 65 D PL2000 GB 65 168 10 01...
Page 141: ...D 81 D PL2000 GB 81 168 10 01 2 3 1 9 5 7 6 4 13 12 10 11 14 15 8 Pult3new Tif...
Page 143: ...D 83 D PL2000 GB 83 168 10 01 2 3 1 9 5 7 6 4 13 12 10 11 14 15 8 Pult3new Tif...
Page 147: ...D 87 D PL2000 GB 87 168 10 01 2 5 1 7 4 6 3 12 11 8 10 13 14 9 Pult4new Tif...
Page 149: ...D 89 D PL2000 GB 89 168 10 01 2 5 1 7 4 6 3 12 11 8 10 13 14 9 Pult4new Tif...
Page 178: ...D 118 D PL2000 GB 118 168 10 01 Moba1can jpg 7 6 8 9 11 1 3 4 5 2 10...
Page 206: ...D 146 D PL2000 GB 146 168 10 01 6 8 MOBA Matic error messages...
Page 219: ...D 159 D PL2000 GB 159 168 10 01 Milling Pult2new_a tifPult3new tif 15 14 34 29 9 26 25 24...
Page 227: ...D 167 D PL2000 GB 167 168 10 01 Notlenkung2 jpg 9 10 11 3 1 2 4 7 8 5 6 12...