D 148
D PL2
000.
G
B
14
8-
16
8 -
10.
0
1
Checklist for machine operator
Once the maintenance and checking work listed in the maintenance manual has been
conducted at the specified intervals, the inspections and control work listed in the fol-
lowing list should also be noted and conducted.
This work is used to assess the machine status and to assure perfect operations as
well as personal safety.
If permitted by the operations in question, the checks should be conducted before,
during and after use.
Any defects found should be rectified immediately in compliance with the safety reg-
ulations.
Check!
How?
Emergency-stop button
- on main control panel
- on the side control units
Check with engine running:
Engine must shut down immediately
after actuation.
The button engages and must be pulled
out so that the engine can be started
again.
Warning signal and warning information
via display indicator
Horn
- on main control panel
- on the side control units
Briefly press horn knob.
Horn signal must sound.
Reverse travel warning device
Check with engine running.
Acoustic signal must sound during
reverse travel.
Lighting
-
Operating headlight
-
Rotary beacons
-
Hazard flasher
Lights must function,
keep headlight glass clean.
Steering system
Check with engine running:
Machine in straight-ahead travel posi-
tion, steering system responds in sync
with the steering lever adjustment, uni-
form steering locks in all steering vari-
ants (when in co-ordinated steering
mode and in crab steering mode, the
rear axle does however respond with a
slight delay).
Precise straight-ahead position of front
and rear axle once the appropriate func-
tion keys have been pressed.
Summary of Contents for PL2000S
Page 1: ...900 98 04 83 Cold planer PL2000S PL2100S Operating instructions Valid for 02 10 01...
Page 2: ......
Page 39: ...B 29 B PL2000 GB 29 34 10 01 39 48 20 50 9 34 43 44 45 46 41 42 35 35 36 49 40 47 38 37...
Page 40: ...B 30 B PL2000 GB 30 34 10 01 56 55 52 53 54 56 57 51...
Page 62: ...D 2 D PL2000 GB 2 168 10 01 2 Controls 2 3 PL2000new cdr 1...
Page 66: ...D 6 D PL2000 GB 6 168 10 01 3 8 9 2 1 4 5 10 11 12 Pult1neu Tif 7 5...
Page 82: ...D 22 D PL2000 GB 22 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 84: ...D 24 D PL2000 GB 24 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 86: ...D 26 D PL2000 GB 26 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 88: ...D 28 D PL2000 GB 28 168 10 01 41 39 42 28 29 30 35 33 34 43 40 38 36 37 Pult2new_a tif 31 32...
Page 90: ...D 30 D PL2000 GB 30 168 10 01 44 45 47 46 48 53 52 50 51 49 Pult2newa tif...
Page 92: ...D 32 D PL2000 GB 32 168 10 01 44 45 47 46 48 53 52 50 51 49 Pult2newa tif...
Page 119: ...D 59 D PL2000 GB 59 168 10 01 Engine fault codes...
Page 120: ...D 60 D PL2000 GB 60 168 10 01...
Page 121: ...D 61 D PL2000 GB 61 168 10 01...
Page 122: ...D 62 D PL2000 GB 62 168 10 01...
Page 123: ...D 63 D PL2000 GB 63 168 10 01...
Page 124: ...D 64 D PL2000 GB 64 168 10 01...
Page 125: ...D 65 D PL2000 GB 65 168 10 01...
Page 141: ...D 81 D PL2000 GB 81 168 10 01 2 3 1 9 5 7 6 4 13 12 10 11 14 15 8 Pult3new Tif...
Page 143: ...D 83 D PL2000 GB 83 168 10 01 2 3 1 9 5 7 6 4 13 12 10 11 14 15 8 Pult3new Tif...
Page 147: ...D 87 D PL2000 GB 87 168 10 01 2 5 1 7 4 6 3 12 11 8 10 13 14 9 Pult4new Tif...
Page 149: ...D 89 D PL2000 GB 89 168 10 01 2 5 1 7 4 6 3 12 11 8 10 13 14 9 Pult4new Tif...
Page 178: ...D 118 D PL2000 GB 118 168 10 01 Moba1can jpg 7 6 8 9 11 1 3 4 5 2 10...
Page 206: ...D 146 D PL2000 GB 146 168 10 01 6 8 MOBA Matic error messages...
Page 219: ...D 159 D PL2000 GB 159 168 10 01 Milling Pult2new_a tifPult3new tif 15 14 34 29 9 26 25 24...
Page 227: ...D 167 D PL2000 GB 167 168 10 01 Notlenkung2 jpg 9 10 11 3 1 2 4 7 8 5 6 12...