55
POWER INSTRUMENTS
03, 04: when the meter is set to “2LL”, it is U23 and
U2 for others.
05, 06: when the meter is set to “2LL”, it is U31 and
U3 for others.
07: There are two modes of clearance: “assign”
means clear at an assigned time, this will skip the 8th
screen to the 9th to set the time. “At once” means
clear at once after you finish the 8th screen. After the
clearance, all time values will be 0 and voltage
eligibility will be 100%.
08: Finish this page when you select the “at once”
mode.
05: High limit of
U3 (U31)
06: Low limit of
U3 (U31)
07: Voltage Eligibility
clearance mode
03: High limit of
U2 (U23)
04: Low limit of
U2 (U23)
V/A
V/A
V/A
V/A
V/A
08: Voltage Eligibility
clear at once setting
V/A
Summary of Contents for XPQ
Page 1: ...POWER INSTRUMENTS DPMS XPQ Multi Function Power Meter User Manual 1087 332...
Page 2: ......
Page 7: ...Chapter 1 Introduction Purpose Application Area Functions DPMS XPQ Series 5...
Page 13: ...Chapter 2 Installation Appearance and Dimensions Installation Method Wiring 11...
Page 30: ...28 DPMS XPQ User Manual 6 2LL 2CT Fig 2 23 2LL 2CT 7 2LL 1CT Fig 2 24 2LL 1CT...
Page 59: ...Chapter 4 Function and Software Functionality and Utility Software 57...
Page 68: ...66 DPMS XPQ User Manual Here is an example Fig 4 7 Demand Here is to set demand...
Page 90: ...88 DPMS XPQ User Manual Fig 4 20 Voltage Eligibility Ratio...
Page 126: ...124 DPMS XPQ User Manual...
Page 127: ...125 Appendix Appendix A Technical Data and Specifications Appendix B Ordering Information...
Page 133: ......