2. INSTALLATION
Page 33
© 1998-2008 DH Instruments, a Fluke Company
•
Verify that the piston-cylinder module is correctly cleaned and operating properly
(see Section 5.3).
•
PG7202 only: Ensure that the piston-cylinder module liquid reservoir is filled (see Section 5.3.3).
•
Verify that there are NO leaks in the pressure system.
2.5
SHORT TERM STORAGE
The following is recommended for short term storage of PG7000.
Remove all masses from the PG7000 Platform (manual mass set only).
Vent all circuits to atmosphere.
Turn OFF power using the power switch on the rear of the PG7000 Terminal.
Cover the PG7000 Platform and mass set with the dust covers included in the platform and mass set
accessories (not used with AMH mass handling system).