9
Electrical CAM
DVP-PM Application Manual
9-10
Slave
max
=180
(
)
Slave unit
Master
=360
max
(
)
Master unit
Start Cyclic E-CAM
The timing diagram below indicates an operation process of cyclic E-CAM operation with synchronized
output position between 60~300.
1. In T1, D1846 bit 13 = ON, cyclic E-CAM is enabled.
2. After the initialization interval of T2, M1812 = ON to indicate the completion of E-CAM initialization.
3. In T3, cyclic operation starts after M1812 = ON. Slave executes with Master constantly according to the
E-CAM Data.
4. At the same time, CLR0 outputs according to the synchronized output range. When M1813 = ON, an
E-CAM cycle is completed. User has to reset the flag for indicating the completion of other E-CAM
cycles.
D1846 b13= ON
enables cyclic E -CAM
M1812=ON,
initialization completed
CLR0 sync output
M1813, E-CAM completion
T1
T2
T3
n n+60
n+300
Slave
Position
Master
position
Reset by user
Stop Cyclic E-CAM
There are two ways to stop cyclic E-CAM:
1.
When D1846 bit 13 (enabling cyclic E-CAM) = OFF, Slave of E-CAM stops immediately.
Summary of Contents for DVP-10PM
Page 1: ......
Page 45: ...2 Hardware Specifications and Wiring DVP PM Application Manual 2 30 MEMO...
Page 125: ...3 Functions of Devices in DVP PM DVP PM Application Manual 3 80 MEMO...
Page 341: ...8 Application Examples DVP PM Application Manual 8 2 Trajectory 3 Trajectory 4...
Page 427: ...9 Electrical CAM DVP PM Application Manual 9 74...
Page 437: ...10 Encrypting User Program DVP PM Application Manual 10 10 MEMO...
Page 458: ...11 G code Application DVP PM Application Manual 11 21 B O100 main program...
Page 561: ...14 Appendix DVP PM Application Manual 14 4 MEMO...