A H 5 0 0
Hardware and Operation Manual
9 - 1 2
9.2
Creating a Network Architecture
9.2.1
Deploying Nodes
After users open the NWCONFIG window for project
s
for the first time, the device
s
for which the project
s are
created will be deployed in the working area in the NWCONFIG window.
If the devices deployed
in the working
area include
AH500 series
CPU modules, the modules connected to the CPU modules,
the parameters in the
CPU modules, and the
parameters
in the modules connected to the CPU modules
will be displayed
according
to
the setting in HWCONFIG.
T
he devices deployed in the working area can not be changed
or deleted.
T
he users can add other PLCs or devices to the work
ing area. T
here are two ways to add a new device to the
working area.
Method 1
Select a PLC or a device on the device list. After the users double
-
click the PLC or the device, the PLC or
the device will be put at the right side of the rightmost device in the working area.
Summary of Contents for AH500 series
Page 35: ...AH500 Hardware and Operation Manual 2 2 2 12 2 Profiles 2 117 2 12 3 Dimensions 2 118 ...
Page 153: ...AH500 Hardware and Operation Manual 2 120 MEMO ...
Page 167: ...AH500 Hardware and Operation Manual 3 14 MEMO ...
Page 343: ...AH500 Hardware and Operation Manual 6 38 MEMO ...
Page 361: ...AH500 Hardware and Operation Manual 7 18 MEMO ...
Page 403: ...Chapter 8 Hardware Configuration 8 42 MEMO ...
Page 412: ...Chapter 9 Network Configuration 9 9 ...
Page 445: ...AH500 Hardware and Operation Manual 9 42 MEMO ...
Page 552: ...Chapter 12 Troubleshooting 12 3 12 1 3 Troubleshooting Procedure ...
Page 649: ...AH500 Hardware and Operation Manual A 8 ...
Page 657: ...AH500 Hardware and Operation Manual A 16 MEMO ...
Page 658: ...B 1 Appendix B Device Addresses Table of Contents B 1 Device Addresses B 2 ...
Page 663: ...AH500 Hardware and Operation Manual C 4 MEMO ...
Page 681: ...AH500 Hardware and Operation Manual 3 14 MEMO ...