ES601
Plus
OPERATING MANUAL
When testing patient leakage, ES601
Plus
can be configured to record the following AC and DC values for
each group of parts defined in the test setup:
Normal Polarity
Normal Condition
Single-Fault Condition, Line 2 Open
Single-Fault Condition, Earth Open
SFC, Mains on Applied Part(s)
(1)
(NP:NC)
(NP:SF L2O)
(NP:SF EO)
(NP:SF MAP)
Reverse Polarity
Normal Condition
Single-Fault Condition, Line 2 Open
Single-Fault Condition, Earth Open
SFC, Mains on Applied Part(s)
(1)
(RP:NC)
(RP:SF L2O)
(RP:SF EO)
(RP:SF MAP)
(1) Type BF or CF applied parts only; not tested for Type B
Under the IEC60601 standard, patient connections within "Type CF" groups are tested individually in turn.
In this case, for each normal (NC) and single-fault (SF) condition ES601
Plus
will record the number of the
patient connection that produces the highest leakage.
In addition to NC and SF conditions listed above, IEC60601 and AAMI-ES1 standards require
supplementary test conditions (STC). ES601
Plus
allows the user to optionally enable or disable the STC in
the leakage setup, according to the characteristics of the DUT. Optional STC include:
•
performing tests with the DUT power switch in the "ON" position and also in the "OFF" position
(ON/OFF test conditions);
•
applying mains supply voltage to isolated signal inputs/outputs on the DUT, or connecting such
1
isolated signals to protective earth (MIO/IOE test conditions), and;
•
connecting floating (ungrounded) metal parts on the DUT to protective earth (ME test condition).
During the test, ES601
Plus
measures patient leakage for each NC or single-fault SF condition in
combination with all STC enabled by the user. For each NC or SF condition, ES601
Plus
records the
maximum leakage observed and the STC that produced the maximum leakage.
Patient leakage tests can be performed manually, but may be complex and time consuming to set up,
particularly if there are a large number of applied parts or supplementary test conditions to specify. To save
you time, ES601
Plus
allows you to program and save such setups as automated test sequences, which are
further described in Section 2.1.12.
An example of an isolated signal input/output would be a transformer-coupled data connection, for example,
1
an Ethernet communications port on the DUT.
Overview/Chapter 2
#
Page 14
Summary of Contents for ES601 Plus
Page 1: ...Operating Manual ES601Plus Inte rnatio nal Auto m ate d Ele c tric al Safe ty Analyze r ...
Page 2: ......
Page 4: ......
Page 8: ...Page iv ...
Page 19: ...ES601Plus OPERATING MANUAL Definitions Page xv ...
Page 39: ...ES601Plus OPERATING MANUAL Overview Chapter 2 Page 20 ...
Page 57: ...ES601Plus OPERATING MANUAL Setup Chapter 3 Page 38 ...
Page 117: ...ES601Plus OPERATING MANUAL Manual Testing Chapter 5 Page 98 ...
Page 151: ...ES601Plus OPERATING MANUAL Automated Testing Chapter 6 Page 132 ...
Page 159: ...ES601Plus OPERATING MANUAL Computer Control Chapter 7 Page 140 ...
Page 193: ...ES601Plus OPERATING MANUAL ES601pc Software Chapter 8 Page 174 ...
Page 195: ...ES601Plus OPERATING MANUAL ES601pc Software Chapter 8 Page 176 ...
Page 223: ...ES601Plus OPERATING MANUAL Appendix B Page 204 ...
Page 227: ...ES601Plus OPERATING MANUAL Appendix C Page 208 ...
Page 228: ...ES601Plus OPERATING MANUAL APPENDIX D Importing Equipment Records Appendix D Page 209 ...
Page 229: ...ES601Plus OPERATING MANUAL Appendix D Page 210 ...