WARNING
Use 24 V DC supply of type PELV to ensure correct
galvanic isolation (type PELV) on the control terminals of
the adjustable frequency drive.
4.1.15 Access to Control Terminals
All terminals to the control cables are located beneath the
LCP. They are accessed by opening the door of the Nema
1 / Nema 12 or removing the covers of the IP00 Open
Chassis version.
4.1.16 Electrical Installation, Control
Terminals
To connect the cable to the terminal:
1.
Strip insulation by about 0.34–0.39 in [9–10 mm].
130BA150.10
9 - 10 mm
(0.37 in)
2.
Insert a screwdriver
1)
in the square hole.
3.
Insert the cable in the adjacent circular hole.
130B
T312.10
4.
Remove the screwdriver. The cable is now
mounted in the terminal.
How to Install
VLT AQUA 12-Pulse High Power Instruction Manual
MG.20.Y1.22 - VLT
®
is a registered Danfoss trademark
4-15
4
4