![background image](http://html1.mh-extra.com/html/daikin/sky-air-b-series-r-410a/sky-air-b-series-r-410a_service-manual_2460071319.webp)
Outdoor Unit (50/60 class)
Si21-205
308
Removal Procedure
4.8
Removal of the Compressor
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove the terminal
cover.
2
Disconnect the lead
wires of the
compressor.
Be careful so as not to burn
the compressor terminals or
the name plate.
Make a note.
U : red
V : yellow
W : blue
N : brown
N
W
U
V
Summary of Contents for Sky Air B-Series R-410A
Page 7: ...Si21 205 vi Table of Contents ...
Page 15: ...Models Si21 205 4 Model Name and Power Supply ...
Page 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Page 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Page 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Page 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Page 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Page 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...