![background image](http://html1.mh-extra.com/html/daikin/sky-air-b-series-r-410a/sky-air-b-series-r-410a_service-manual_2460071253.webp)
FFQ25/35/50/60BV1B
Si21-205
242
Removal Procedure
1.10 Installation of Drain Pump
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Installing the drain pump
1
Put the lead wire in the
wiring groove properly,
fix the drain pump ass'y
with screw
and insert
the drain hose.
2
Insert the drain hose
into the hose plug of the
drain pump up to the
root of plug securely.
Inserting the drain hose
should be executed before
installation of float switch in
order to prevent the float
switch from damage.
Put the tie wrap on the white
line on the hose inserted.
When inserting the drain
hose, be sure to wear safety
gloves to prevent your finger
from injury with heat
exchanger fin.
3
Put the tie wrap on the
hose.
Screw
Q
Wiring groove
(S2665)
(S2666)
(S2668)
White line
(S2667)
Summary of Contents for Sky Air B-Series R-410A
Page 7: ...Si21 205 vi Table of Contents ...
Page 15: ...Models Si21 205 4 Model Name and Power Supply ...
Page 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Page 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Page 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Page 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Page 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Page 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...