![background image](http://html1.mh-extra.com/html/daikin/sky-air-b-series-r-410a/sky-air-b-series-r-410a_service-manual_2460071243.webp)
FFQ25/35/50/60BV1B
Si21-205
232
Removal Procedure
1.3
Removal of Decoration Panel
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Removing the decoration
panel
1
Remove the switch box
cover and disconnect
the connector of swing
motor from the harness
connector of electric
parts.
2
Check that the
provisional hanger is in
the position where it
can be engaged with
the hook of switch box.
3
The decoration panel is
attached with 4
mounting screws.
Remove the two fixing
screws at the switch
box side first.
4
Loosen the other two
screws by approx. 10
mm.
The decoration panel is
hung with these two
fixing screws and the
provisional hanger.
(S2636)
(S2637)
Provisional hanger
Hook of switch box
(S2638)
Provisional hanger
Loosen the two screws
by approx. 10 mm
(S2639)
Summary of Contents for Sky Air B-Series R-410A
Page 7: ...Si21 205 vi Table of Contents ...
Page 15: ...Models Si21 205 4 Model Name and Power Supply ...
Page 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Page 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Page 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Page 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Page 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Page 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...