![background image](http://html1.mh-extra.com/html/daikin/sky-air-b-series-r-410a/sky-air-b-series-r-410a_service-manual_2460071259.webp)
FFQ25/35/50/60BV1B
Si21-205
248
Removal Procedure
5
Reinstall the lead wire
of thermistor and anti
sweat tube on the
original position by
using two pieces of
heat resistance tie
wrap.
∗
Heat resistance tie wrap
Parts No.:1278921
(Drg No.:4SA90202-1)
6
Put the heat exchanger
partition plate inside
and fix them with two
screws.
7
Pass the thermistor
ass'y through the
clamps and the slit of
partition plate securely
as the original state.
Pass the lead wire of
motor also through the
clamp securely.
8
Insert the grounding
terminal to the header.
Step
Procedure
Points
(S2673)
Anti sweat tube
(S2672)
Heat exchanger
partition plate
Fan motor lead wire
Clamp
Clamps
Slit of partition plate
Fan motor lead wire
Thermistor ass'y
(S2683)
(S2684)
Summary of Contents for Sky Air B-Series R-410A
Page 7: ...Si21 205 vi Table of Contents ...
Page 15: ...Models Si21 205 4 Model Name and Power Supply ...
Page 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Page 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Page 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Page 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Page 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Page 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...