![background image](http://html1.mh-extra.com/html/daikin/sky-air-b-series-r-410a/sky-air-b-series-r-410a_service-manual_2460071274.webp)
Si21-205
FHQ35/50/60BUV1B
Removal Procedure
263
2.7
Removal of Swing Motor
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove the screw from
the right side panel.
Slide the right side
panel toward the front
and detach it.
2
Cut off the tie-wrap of
the swing motor
connector.
3
Disconnect the
connector from the
swing motor connector.
4
Remove the screw from
the swing motor. The
swing motor has two
projections on it. Lower
the swing motor and
take it out.
When reassembling, fit the
horizontal blade shaft end to
the D-profiled bearing.
Apply the tie-wrap to the
connectors to secure them in
place.
Summary of Contents for Sky Air B-Series R-410A
Page 7: ...Si21 205 vi Table of Contents ...
Page 15: ...Models Si21 205 4 Model Name and Power Supply ...
Page 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Page 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Page 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Page 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Page 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Page 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...