![background image](http://html1.mh-extra.com/html/daikin/sky-air-b-series-r-410a/sky-air-b-series-r-410a_service-manual_2460071278.webp)
Si21-205
Outdoor Unit (25/35 class)
Removal Procedure
267
3.3
Removal of PCB and Electrical Box
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work
.
Step
Procedure
Points
1. Remove the shelter.
The shelter has five hooks.
Be sure to avoid forgetting to
restore the shelter and to
avoid losing or damaging it.
1
Undo the five hooks
and remove the
shelter.
2. Remove the PCB.
1
Disconnect the ground
wire.
Summary of Contents for Sky Air B-Series R-410A
Page 7: ...Si21 205 vi Table of Contents ...
Page 15: ...Models Si21 205 4 Model Name and Power Supply ...
Page 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Page 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Page 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Page 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Page 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Page 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...