![background image](http://html1.mh-extra.com/html/daikin/sky-air-b-series-r-410a/sky-air-b-series-r-410a_service-manual_2460071247.webp)
FFQ25/35/50/60BV1B
Si21-205
236
Removal Procedure
1.5
Removal of Swing Motor
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Removing the
decoration panel
Refer to the
"Removal of
Decoration Panel"
2
Pull out the swing motor
harness from the wiring
groove.
3
Remove two mounting
screws for swing motor
mounting plate to
remove the plate.
4
Turn the horizontal
vane to downward
manually, and turn up
the panel side gear to
disengage the motor
side gear.
5
Remove the swing
motor.
Precaution during swing
motor installation
1
Engage the swing
motor-side gear with
the panel-side one.
(Otherwise, faulty
swinging operation or
abnormal noise may be
caused.)
Install the motor after
checking of correct gear
engagement.
2
Install the swing motor
in reverse process of
removal procedure.
When install the decoration
panel, be careful not to catch
the lead wire.
3
After installing the swing
motor, be sure to turn on
the power switch for
resetting (for initializing
the vane positions).
Fixing screw
Wiring groove
(S2647)
(S2648)
Motor-side gear
Panel-side gear
(S2649)
Summary of Contents for Sky Air B-Series R-410A
Page 7: ...Si21 205 vi Table of Contents ...
Page 15: ...Models Si21 205 4 Model Name and Power Supply ...
Page 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Page 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Page 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Page 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Page 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Page 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...