![background image](http://html1.mh-extra.com/html/daikin/sky-air-b-series-r-410a/sky-air-b-series-r-410a_service-manual_2460071265.webp)
FFQ25/35/50/60BV1B
Si21-205
254
Removal Procedure
2. Installing the receiver
section
1
Pass through the lead
wire of the receiver
section, and insert the
corner cover.
2
Put the wire in the
wiring groove on the
hooking piece securely.
3
Install the switch box
and the decoration
panel.
When install the decoration
panel,
be careful not to catch the
lead wire.
4
Insert the lead wire of
the receiver section to
connector X1A, and
bind the two wires with
tie wrap.
5
Set the dip switches.
Setting the dip switches
Set the dip switches with
same conditions as those of
the transmission parts box
removed.
(For details of setting, refer
to the instruction manual of
wireless remote controller
kit.)
6
Mount the transmission
parts box with two
screws after checking
that the tie wrap is in
the fixing position and
the lead wire is caught
with fixing part of tie
wrap and can not come
out.
7
Insert the lead wire
from the transmission
parts box to the
connector X24A on
indoor unit.
Pass through the lead
wire to be connected to
X24A on the indoor unit
PC board under the
hooking piece.
Step
Procedure
Points
(S2700)
Hooking piece
(S2701)
Tie wrap
X2A
X1A
(S2696)
(S2694)
1 2
3
M S
SS2
SS1
(S2702)
X24
(S2703)
Hooking piece
Summary of Contents for Sky Air B-Series R-410A
Page 7: ...Si21 205 vi Table of Contents ...
Page 15: ...Models Si21 205 4 Model Name and Power Supply ...
Page 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Page 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Page 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Page 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Page 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Page 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...