![background image](http://html1.mh-extra.com/html/daikin/sky-air-b-series-r-410a/sky-air-b-series-r-410a_service-manual_2460071254.webp)
Si21-205
FFQ25/35/50/60BV1B
Removal Procedure
243
4
Insert the float switch
ass'y.
At this time, put the lead
wires in the wiring
groove properly.
5
Install the drain pump
together with the float
switch with screw
and
.
Step
Procedure
Points
(S2661)
Wiring groove
Lead wires
Screw
R
Screw
S
(S2669)
When install the drain
pan, put the lead wires
of float switch and drain
pump in wiring groove
and pass the lead wires
above on the black
sealing material on the
drain pan.
(Otherwise, due
dripping may occur due
to leakage of cool air.)
Summary of Contents for Sky Air B-Series R-410A
Page 7: ...Si21 205 vi Table of Contents ...
Page 15: ...Models Si21 205 4 Model Name and Power Supply ...
Page 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Page 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Page 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Page 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Page 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Page 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...