3
|
Components
Service manual
242
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03
2
2
2
1
4×
3.55 N • m
a
a
Speed nut
3.17.7 To install the discharge grille
1
Insert the hooks. To prevent breaking the hooks:
▪
First insert the bottom hooks (2×).
▪
Then insert the top hooks (2×).
2
Insert and fix the screws (4×)(delivered as accessory).
1
2
2
1
4 N • m
4×
T25
3.18 Reactor
INFORMATION
Procedures are ONLY for reactors of the single phase outdoor unit.
NO procedures available for reactors of the 3‑phase outdoor unit.
Summary of Contents for ALTHERMA
Page 357: ...11 11 ...
Page 358: ......
Page 359: ......
Page 360: ...ESIE20 06A 2021 03 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...