3
|
Components
Service manual
97
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03
Is the 4‑way valve coil firmly fixed and
not visually damaged?
Action
Yes
Perform an electrical check of the 4‑way
valve, see
No
Fix or replace the 4‑way valve coil, see
To perform an electrical check of the 4-way valve
1
First perform a mechanical check of the 4-way valve, see
2
Unplug the 4-way valve connector from the appropriate PCB.
3
Measure the resistance of the 4-way valve coil between the pins of the 4-way
valve connector.
Result:
The measured value must be:
Unit
Coil resistance
1‑phase outdoor unit
1,4 kΩ ± 10%
3‑phase outdoor unit
520~600 Ω
Is the measured value correct?
Action
Yes
Continue with the next step.
No
Replace the 4‑way valve coil, see
When outdoor unit is combined with H Cooling indoor unit
INFORMATION
This procedure is ONLY possible when the outdoor temperature is within the
temperature range for both
Heating
and
Cooling
operation mode. See the
databook on Business Portal for the temperature range of the operation modes.
1
Connect the 4‑way valve connector to the appropriate PCB.
2
Turn ON the power using the respective circuit breaker.
3
Activate
Heating
operation via the user interface.
4
With the 4‑way valve connector connected to the PCB, measure the voltage
on the 4‑way valve connection of the PCB.
Result:
The measured voltage MUST be:
Unit
Voltage
1‑phase outdoor unit
230 V AC
3‑phase outdoor unit
12 V DC
5
De-activate
Heating
and activate
Cooling
operation via the user interface.
6
Measure the voltage on the 4‑way valve connection on the PCB.
Result:
The measured voltage MUST be:
Unit
Voltage
1‑phase outdoor unit
0 V AC
3‑phase outdoor unit
0 V DC
Summary of Contents for ALTHERMA
Page 357: ...11 11 ...
Page 358: ......
Page 359: ......
Page 360: ...ESIE20 06A 2021 03 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...