![background image](http://html.mh-extra.com/html/daikin/altherma/altherma_service-manual_501166301.webp)
4
|
Third party components
Service manual
301
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03
All valves are open?
Action
No
Open the specific valve(s) of the water
circuit, see
302].
To check for an external heat source
1
Inspect the installation outside the unit and check for the presence of an
external heat source. This may have an impact on the water temperature
inside the unit.
An external heat source was found in
the installation?
Action
Yes
Remove the external heat source from
the installation, see
302].
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
To check if the field installed air purge valves are installed on the correct locations
1
Check the installation outside the unit. All highest points of the installation
MUST have air purge valves installed. The air purge valves MUST NOT be
installed on other locations.
All air purge valves are installed on the
correct locations?
Action
Yes
Return to the troubleshooting of the
specific error and continue with the
next procedure.
No
Install the specific air purge valve(s) on
the correct location(s) in the water
circuit, see
302].
To check if a by-pass is installed in the water circuit
1
A by‑pass MUST be installed in the water circuit outside the unit. This is
needed to make sure that water can still flow through the circuit even when
all loops (underfloor heating, radiators, …) are shut‑off (e.g. for anti‑freeze
function).
b
c
a
d
e
a
By‑pass
b
Underfloor heating (cooling) circuit
c
Radiators circuit
d
Indoor or outdoor unit
e
Space heating (cooling) water circuit
Summary of Contents for ALTHERMA
Page 357: ...11 11 ...
Page 358: ......
Page 359: ......
Page 360: ...ESIE20 06A 2021 03 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...