
Ontario Drive & Gear Limited www.centaur8x8.ca
(519) 662-2840 FAX (519) 662-2421
Centaur Service Manual Transmission
Ontario Drive & Gear Limited www.centaur8x8.ca
(519) 662-2840 FAX (519) 662-2421
TR-43
2. Assemble the CE-001 Output Gear 45T R to the shortest splined end of the Output Shaft.
The oil journals are also machined to this end of the shaft.
Photo TR-253 & 254
3. Secure the Output Gear with a 106-16 Retaining Ring.
Photo TR-255
TR-252
TR-253
TR-254
TR-255
TR-256
Building Assy. E
1. Take a second CE-003 Output Shaft, and
install 2 more 101-37 Ball Bearings to
each end as explained in
Building Assy.
D
Building Assy. F
1. Place the CE-032 Spline Adapter into the
hot oil bath for approximately 2-3 min
-
utes.
Photo TR-256
Summary of Contents for 2001 950
Page 2: ......
Page 4: ......
Page 353: ......
Page 413: ......
Page 416: ...saue Axial Piston Pumps Motors and Transmissions Technical Information Series 70 15 Series ...
Page 429: ...14 saue Axial Piston Pumps Motors and Transmissions Series 70 15 Series Notes ...
Page 447: ...31 saue Axial Piston Pumps Motors and Transmissions Series 70 15 Series Notes ...
Page 449: ......