PTP 250 User Guide
Grounding and lightning protection
phn-2510_002v000 (Mar 2012)
2-21
Protection requirements on a high rise building
If the ODU is to be mounted on a high rise building, it is likely that cable entry is at roof
level (
Figure 16
) and the equipment room is several floors below (
Figure 17
). In addition to
the general protection requirements (above), the following requirements must be
observed:
x
The ODU must be below the lightning terminals and finials.
x
A grounding conductor must be installed around the roof perimeter, to form the main
roof perimeter lightning protection ring.
x
Air terminals are typically installed along the length of the main roof perimeter
lightning protection ring typically every 6.1 m (20 ft).
x
The main roof perimeter lightning protection ring must contain at least two down
conductors connected to the grounding electrode system. The down conductors should
be physically separated from one another, as far as practical.
Figure 16
Grounding and lightning protection on building
Air terminal (finial)
Tower grounding
conductor
Building ground ring
AC
service
ODU
To equipment area
CAT5e cable: gel-filled, shielded
with copper-plated steel
PTP 250 ground cables
Building ground system
Summary of Contents for PTP 250
Page 1: ...Cambium PTP 250 User Guide System Release 250 02 01 ...
Page 8: ...Safety and regulatory information VI phn 2510_002v000 Mar 2012 ...
Page 20: ...List of Tables xii phn 2510_002v000 Mar 2012 ...
Page 58: ...System management Chapter 1 Product description 1 30 phn 2510_002v000 Mar 2012 ...
Page 104: ...Limit of liability Chapter 3 Legal information 3 12 phn 2510_002v000 Mar 2012 ...
Page 122: ...Notifications Chapter 4 Reference information 4 18 phn 2510_002v000 Mar 2012 ...
Page 152: ...Installing the PoE power supply Chapter 5 Installation 5 30 phn 2510_002v000 Mar 2012 ...