Web-based management
Chapter 7: Operation
7-6
phn-2510_002v000 (Mar 2012)
Viewing the system summary
To display the System Summary page, select menu option
Home
.
The System Summary page (
Figure 46
) contains a high level summary of the status of the
wireless link and associated equipment.
Figure 46
System Summary page
The attributes of the System Summary page are described in
Table 40
.
Table 40
System Summary attributes
Attribute
Meaning
Wireless Link
Status
Current status of the wireless link.
A green background with status text ‘Up’ means that the point-to-
point link is established.
A yellow background with suitable status text (for example
‘Acquiring’) indicates that the link is not established.
Whenever the Wireless Link Status is not ‘Up’, a yellow warning
triangle is displayed on the navigation bar. For more information,
refer to
Managing link status and alerts
on page
7-13
.
System Name
Name of this PTP 250 system (link). This is set in the Installation
Wizard; see
Step 1: Wireless configuration
on page
6-22
.
Site Name
Location of this link end. This is set in the Installation Wizard; see
Step 1: Wireless configuration
on page
6-22
.
Elapsed Time
Indicator
The time (days and hh:mm:ss) that has elapsed since the last
system reboot.
The system can reboot for several reasons, for example,
commanded reboot from the Reboot PTP 250 webpage, or a
power cycle of the equipment.
Summary of Contents for PTP 250
Page 1: ...Cambium PTP 250 User Guide System Release 250 02 01 ...
Page 8: ...Safety and regulatory information VI phn 2510_002v000 Mar 2012 ...
Page 20: ...List of Tables xii phn 2510_002v000 Mar 2012 ...
Page 58: ...System management Chapter 1 Product description 1 30 phn 2510_002v000 Mar 2012 ...
Page 104: ...Limit of liability Chapter 3 Legal information 3 12 phn 2510_002v000 Mar 2012 ...
Page 122: ...Notifications Chapter 4 Reference information 4 18 phn 2510_002v000 Mar 2012 ...
Page 152: ...Installing the PoE power supply Chapter 5 Installation 5 30 phn 2510_002v000 Mar 2012 ...