PTP 250 User Guide
Preparing for installation
phn-2510_002v000 (Mar 2012)
5-3
Selecting installation options
The end product of the link planning process should be a report specifying which
installation options are required. Refer to
PTP LINKPlanner
on page
2-10
.
Preparing personnel
In no event shall Cambium Networks be liable for any injury or damage caused during the
installation of the Cambium PTP 250.
Ensure that only qualified personnel undertake the installation of a PTP 250 link.
Ensure that all safety precautions are observed.
Preparing inventory
Perform the following inventory checks:
x
Check that an installation plan is available and that it is based on the principles
described in
Chapter 2: Planning considerations
.
x
Check that the correct components are available, as described in
Ordering components
on page
2-24
.
x
Check the contents of all packages against their packing lists.
Preparing tools
Check that following specific tools are available, in addition to general tools:
x
13mm wrench and 22 mm wrench for use with the glands.
x
RJ45 crimp tool (it must be the correct tool for the type of RJ45 being used).
x
Personal Computer (PC) with 1000BaseT Ethernet.
x
Web browser (for example Internet Explorer 7, Internet Explorer 8, Firefox 3 or
Firefox 3.5).
x
Ethernet patch cables.
Summary of Contents for PTP 250
Page 1: ...Cambium PTP 250 User Guide System Release 250 02 01 ...
Page 8: ...Safety and regulatory information VI phn 2510_002v000 Mar 2012 ...
Page 20: ...List of Tables xii phn 2510_002v000 Mar 2012 ...
Page 58: ...System management Chapter 1 Product description 1 30 phn 2510_002v000 Mar 2012 ...
Page 104: ...Limit of liability Chapter 3 Legal information 3 12 phn 2510_002v000 Mar 2012 ...
Page 122: ...Notifications Chapter 4 Reference information 4 18 phn 2510_002v000 Mar 2012 ...
Page 152: ...Installing the PoE power supply Chapter 5 Installation 5 30 phn 2510_002v000 Mar 2012 ...