Testing link end hardware
Chapter 8: Troubleshooting
8-2
phn-2510_002v000 (Mar 2012)
Testing link end hardware
This section describes how to test the link end hardware when it fails on startup or during
operation.
Before testing link end hardware, confirm that all outdoor drop cables, that is those that
connect the ODU to equipment inside the building, are of the supported type, as defined in
Ordering components
on page
2-24
.
These tests apply to installations that use the PoE power supply. If the PIDU is installed
instead of the PoE power supply, the test procedures will be different.
Checking the PoE power supply LEDs
If a fault is suspected in the link end hardware, check the PoE power supply LED states
and use
Table 50
to choose the correct test procedure.
The PTP 250 is supplied with one of two variants of the PoE power supply: the 9001GR
(
Figure 6
) or the PD7001 (
Figure 7
).
Table 50
PoE power supply LED states
PoE type 9001GR
PoE type
PD7001
Go to test procedure
PORT: Off (*)
AC: off
No power detected
on page
8-3
PORT: Off (*)
AC: green (blink)
Incorrect voltage
on page
8-3
PORT: Green (blink)
AC: green (steady)
PORT: green (blink)
Overload or short circuit
on page
8-3
PORT: Yellow (steady)
AC: green (steady)
PORT: off
No device (ODU) detected
on page
8-5
PORT: Green (steady)
AC: green (steady)
PORT: green (steady)
Device (ODU) detected
on page
8-5
(*) For PoE type 9001GR, if the PORT LED is off, this may indicate either “no power
detected” or “incorrect voltage”.
If a fault is suspected in the ODU-PoE drop cable, perform
Testing resistance in the ODU
cable
on page
8-8
.
Summary of Contents for PTP 250
Page 1: ...Cambium PTP 250 User Guide System Release 250 02 01 ...
Page 8: ...Safety and regulatory information VI phn 2510_002v000 Mar 2012 ...
Page 20: ...List of Tables xii phn 2510_002v000 Mar 2012 ...
Page 58: ...System management Chapter 1 Product description 1 30 phn 2510_002v000 Mar 2012 ...
Page 104: ...Limit of liability Chapter 3 Legal information 3 12 phn 2510_002v000 Mar 2012 ...
Page 122: ...Notifications Chapter 4 Reference information 4 18 phn 2510_002v000 Mar 2012 ...
Page 152: ...Installing the PoE power supply Chapter 5 Installation 5 30 phn 2510_002v000 Mar 2012 ...