Installing the drop cable and LPU
Chapter 5: Installation
5-14
phn-2510_002v000 (Mar 2012)
Installing the drop cable and LPU
Perform this task to install the drop cable from the ODU to the PoE power supply, and to
provide grounding and lightning protection for the installation.
This task consists of the following procedures:
x
Preparing drop cables
on page
5-15
.
x
Assembling an RJ45 connector and gland
on page
5-16.
x
Installing and grounding the main drop cable
on page
5-18
.
x
Connecting an RJ45 and gland to a unit
on page
5-19
.
x
Disconnecting an RJ45 and gland from a unit
on page
5-21
.
x
Making a drop cable ground point
on page
5-22
.
x
Installing and grounding the drop cable at building entry
on page
5-26
.
The drop cable and ground cable installation must meet the requirements defined in
Grounding and lightning protection
on page
2-15
.
To provide effective protection against lightning induced surges, grounding cables must
be installed without drip loops and pointing down towards the ground.
To avoid damage to the installation, do not connect or disconnect the drop cable when
power is applied to the PoE power supply.
Summary of Contents for PTP 250
Page 1: ...Cambium PTP 250 User Guide System Release 250 02 01 ...
Page 8: ...Safety and regulatory information VI phn 2510_002v000 Mar 2012 ...
Page 20: ...List of Tables xii phn 2510_002v000 Mar 2012 ...
Page 58: ...System management Chapter 1 Product description 1 30 phn 2510_002v000 Mar 2012 ...
Page 104: ...Limit of liability Chapter 3 Legal information 3 12 phn 2510_002v000 Mar 2012 ...
Page 122: ...Notifications Chapter 4 Reference information 4 18 phn 2510_002v000 Mar 2012 ...
Page 152: ...Installing the PoE power supply Chapter 5 Installation 5 30 phn 2510_002v000 Mar 2012 ...