28
5. INSTALLATION
Connect the eight connectors. (See the connection diagram below.)Using the nuts
mounted to the studs, secure the ground braid and the ground wire (Green-Yellow)
from each respective tower to the joint box.
Using four Torx bolts (M5 x 12), install the joint box cover which was removed in
step
.
To remove, follow the installation sequence in reverse.
Connectors
Control
Assy
Projector
Tower
Assy
Connector
Ground Braid
Ground wire
Summary of Contents for RAZING STORM
Page 4: ...ii Notes...
Page 130: ...126 10 PARTS LISTS 10 8 Gun Assy...
Page 132: ...128 10 PARTS LISTS 10 9 Pedal Assy...
Page 134: ...130 10 PARTS LISTS MEMO...