44
7. OPERATION
7-3-1 Adjustment switches
Open the service door on the Coin Tower Assy to access the adjustment switches.
(a) Service switch (red)
Press this switch to increase the credit count without activating the coin counter.
(b) Test switch
Set this switch to ON to enter the Test mode.
The Test mode allows the change of game fee and the execution of various tests.
(See P. 49 “7-4 Test mode.”)
(c) Select switch
Flip this switch up or down to select an item in the Test mode.
(d) Enter switch (green)
After choosing an item with the Select switch, press this switch to finalize or execute
the selected item.
Press the Service switch slowly and firmly.
Quick pressing may not activate the switch function.
SERVICE
E TE
SELECT
TEST
CO N METER
SERVICE
ENTER
SE ECT
TEST
CO N MET R
( a )
( b )
( c )
( d )
Coin Tower Assy
Service door
7-3 Adjustment
Summary of Contents for RAZING STORM
Page 4: ...ii Notes...
Page 130: ...126 10 PARTS LISTS 10 8 Gun Assy...
Page 132: ...128 10 PARTS LISTS 10 9 Pedal Assy...
Page 134: ...130 10 PARTS LISTS MEMO...