3.7.9 Installing the mains connections cable
Location
The illustration shows the location of the incoming mains cable gland in the
controller.
xx2100002285
Required tools and equipment
Note
Article number
Equipment
Content is defined in section
Standard toolkit for controller on
page 414
.
-
Standard toolkit
-
ESD protective wrist band
Required documents
Note
Article number
Document
3HAC074000-008
Circuit diagram - OmniCore
V250XT
Continues on next page
Product manual - OmniCore V250XT
149
3HAC073447-001 Revision: B
© Copyright 2020-2022 ABB. All rights reserved.
3 Installation and commissioning
3.7.9 Installing the mains connections cable
Summary of Contents for OmniCore V250XT
Page 1: ...ROBOTICS Product manual OmniCore V250XT ...
Page 34: ...This page is intentionally left blank ...
Page 50: ...This page is intentionally left blank ...
Page 174: ...This page is intentionally left blank ...
Page 410: ...This page is intentionally left blank ...
Page 418: ...This page is intentionally left blank ...
Page 454: ......
Page 455: ......