
Table of contents
Protective stop and emergency stop ...........................................................
Emergency release of the robot axes ..........................................................
Make sure that the main power has been switched off ....................................
Safety risks during installation and service work on robots ..............................
Moving robots are potentially lethal ............................................................
First test run may cause injury or damage ....................................................
Work inside the working range of the robot ..................................................
Enabling device and hold-to-run functionality ...............................................
Risks associated with live electric parts .......................................................
The unit is sensitive to ESD .......................................................................
Hot parts may cause burns .......................................................................
Safety risks related to pneumatic/hydraulic systems ......................................
1.3.12 Safety risks during work with gearbox lubricants (oil or grease) .......................
Safety signals in the manual ......................................................................
Safety symbols on product labels ...............................................................
Installation and commissioning
Installation and operational requirements for Foundry Prime robots ............................
Pre-installation procedure .........................................................................
Working range and type of motion ..............................................................
Lifting the robot with fork lift accessory .......................................................
2.7.1.1 Fitting the fork lift accessory ..........................................................
2.7.1.2 Lifting the robot with fork lift truck ...................................................
Lifting robot with roundslings ....................................................................
Manually releasing the brakes ...................................................................
Securing the base plate ............................................................................
Orienting and securing the robot ................................................................
Fitting equipment on robot .......................................................................
Surface inspection before start-up - Foundry Prime .......................................
Loads fitted to the robot, stopping time and braking distances .........................
2.7.11.1 Installing the over pressure limiter on wall ........................................
2.7.11.2 Installing the over pressure limiter unit on robot base .........................
Product manual - IRB 6640 Foundry Prime
5
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
Table of contents
Summary of Contents for IRB 6640 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Page 18: ...This page is intentionally left blank ...
Page 118: ...This page is intentionally left blank ...
Page 438: ...This page is intentionally left blank ...
Page 448: ...This page is intentionally left blank ...
Page 456: ...This page is intentionally left blank ...
Page 486: ...This page is intentionally left blank ...
Page 488: ...This page is intentionally left blank ...
Page 495: ......