
Preparations of lower arm before refitting of gearbox axis 3
Use this procedure to make the necessary preparations of the lower arm before
refitting gearbox axis 3.
Note
Action
Clean the machined surface on the lower
arm where the gearbox axis is located.
1
xx1000000432
Careful cleaning of:
•
guidance edges
for the gearbox in
the lower arm
•
joint surface
2
Parts:
•
A: Joint surface (3x)
•
B: Guidance edge (3x)
•
C: Lower arm
xx1000000433
Apply
Mercasol
on the guidance edges as
well as between these.
3
Parts:
•
A: Mercasol on guidance edge
•
B: Lower arm
•
C: Joint surface (3x)
Note
Make sure that there is no Mercasol on
the joint surfaces.
Continues on next page
424
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.7.3 Replacing gearbox axis 3
Continued
Summary of Contents for IRB 6640 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Page 18: ...This page is intentionally left blank ...
Page 118: ...This page is intentionally left blank ...
Page 438: ...This page is intentionally left blank ...
Page 448: ...This page is intentionally left blank ...
Page 456: ...This page is intentionally left blank ...
Page 486: ...This page is intentionally left blank ...
Page 488: ...This page is intentionally left blank ...
Page 495: ......