
Note
Action
Note
Always apply rust preventive (Mercasol) on
covers, attachment plates and screws
after
refitting these components.
2
Clean the joints that have been opened. See
Cut the paint or surface on the robot before
replacing parts on page 219
3
Shown in the figure
.
Push the cable and connectors down through
the
cable guide
in the center of the frame.
•
Make sure the cables are not twisted
with each other or with customer har-
nesses if any
•
Make a note of the correct positions of
the connectors.
4
Tightening torque for R1.SMB: 10 Nm.
Reconnect connectors
R1.MP and R1.SMB
at
the base.
5
Shown in the figure
.
Make a note of the correct positions of
the connectors!
Position shown in the figure
.
Reconnect the
earth cable
.
6
Shown in the figure
.
Refit the
rear cover plate
to the robot with its
attachment screws.
7
Reconnect all connectors at motors axes 1 and
2.
8
For art. no. see
•
Note
On Foundry Prime robots:
When dismantling the cables from the motors,
the gasket must be replaced.
9
Continues on next page
230
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.3.1 Replacing cable harness, axes 1-6
Continued
Summary of Contents for IRB 6640 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Page 18: ...This page is intentionally left blank ...
Page 118: ...This page is intentionally left blank ...
Page 438: ...This page is intentionally left blank ...
Page 448: ...This page is intentionally left blank ...
Page 456: ...This page is intentionally left blank ...
Page 486: ...This page is intentionally left blank ...
Page 488: ...This page is intentionally left blank ...
Page 495: ......