Note
Action
xx1000000440
Fit M12x16
bolts
in the two M12 disassembly
holes.
Note
Max length 40 mm.
2
Parts:
•
A: M12 bolt for disassembly, upper
•
B: M12 bolt for disassembly, lower
•
C: Attachment screw M12x60 (24
pcs)
See figure above.
Apply Mercasol on the heads of all
M12 at-
tachment screwsafter
tightening.
3
How to lift and refit the upper arm is de-
scribed in section:
•
Replacement of upper arm on
page 273
For art. no. see:
•
Required equipment on page 420
Refit the
upper arm
.
Note
Use a new
sealing axis 2/3
.
4
Concluding refitting procedure
Use this procedure for the concluding procedure of refitting gearbox axis 3.
Note
Action
See section
•
Changing oil, axis-3 gearbox on
page 176
Refill gearbox axis 3 with oil.
1
See section
•
Replacing motor axis 3 on page 354
Refit
motor axis 3
.
2
Calibration is detailed in a separate calib-
ration manual enclosed with the calibra-
tion tools.
Recalibrate the robot.
3
General calibration information is included
in section
.
Continues on next page
Product manual - IRB 6640 Foundry Prime
429
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.7.3 Replacing gearbox axis 3
Continued
Summary of Contents for IRB 6640 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Page 18: ...This page is intentionally left blank ...
Page 118: ...This page is intentionally left blank ...
Page 438: ...This page is intentionally left blank ...
Page 448: ...This page is intentionally left blank ...
Page 456: ...This page is intentionally left blank ...
Page 486: ...This page is intentionally left blank ...
Page 488: ...This page is intentionally left blank ...
Page 495: ......