Note
Action
xx0900000102
Fill the spherical roller bearing at the front
shaft with 20 ml, Optimol PDO.
Note
Open the ventilation screw M6 at the op-
posite side of the link ear.
Refit the M6 screw with sealing washers.
28
Seal and paint the joints that have been
opened. See
the robot before replacing parts on
page 219
29
326
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.5.4.2 Replacing balancing device (design 2)
Continued
Summary of Contents for IRB 6640 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Page 18: ...This page is intentionally left blank ...
Page 118: ...This page is intentionally left blank ...
Page 438: ...This page is intentionally left blank ...
Page 448: ...This page is intentionally left blank ...
Page 456: ...This page is intentionally left blank ...
Page 486: ...This page is intentionally left blank ...
Page 488: ...This page is intentionally left blank ...
Page 495: ......